Enter cases, concurrency and cadence across three tiers. The calculator reports wall-clock minutes under parallelism, monthly eval spend, and how much detection the per-PR subset gives up.

The power block inverts the sizing formula from our eval sample-sizing research to report what each tier can still detect, built on the evidence in the pre-ship testing checklist. The eval budget calculator prices one run; this page prices a cadence and shows what statistical significance costs in CI minutes. The sample-size power calculator sizes one arm; this page inverts that formula for each tier. Where each check belongs in the pipeline is the companion CI guide.

At the defaults the 40-case PR subset runs in 2.6 minutes at 22% power; reaching 80% takes 316 cases and 6.6 minutes, and the release gate's 3 trials add minutes (19.5) without adding power.
The suite and the tiers

Distinct cases in the full eval set. Carry this from the golden-set-size planner; it is a case count, not a run count.

Check this value.

Cases the per-PR tier runs. Set equal to the suite to skip subsetting.

Check this value.

Cases the release gate runs. May exceed the suite when the gate adds fresh items alongside repeats.

Check this value.

Repeats of each case in the PR tier. Repeats reduce variance across repeated runs of the same item. The power block counts distinct cases only.

Check this value.

Repeats of each case in the nightly tier.

Check this value.

Repeats of each case in the release gate.

Check this value.

How many times a judge grades each item. 0 means a deterministic-only suite with no model judge.

Check this value.

The change-impact worksheet can narrow which suites a given change touches.

Time

Wall time of one call to the system under test.

Check this value.

Wall time of one judge call. Required when judge calls per item is above 0.

Check this value.

Requests the harness keeps in flight. 1 means serial.

Check this value.

Provider requests-per-minute cap. Leave blank if you do not know it or have no cap.

Check this value.

Fixed setup before the first model call: checkout, install, container pull. Leave blank to treat it as zero.

Check this value.

Measure your own; the latency budget calculator breaks one call into its parts.

Money

What one graded item costs, model call plus judge.

Check this value.

What one minute of CI runner time costs. Leave blank if runner time is free or billed elsewhere.

Check this value.

Carry this from the eval budget calculator rather than re-deriving it here.

Cadence

Pull requests that trigger the per-PR tier each month.

Check this value.

Nightly full-suite runs per month. 0 turns the tier off.

Check this value.

Powered release gates per month.

Check this value.

Optional. The longest a PR check is allowed to run. Leave blank if you have no cap.

Check this value.

Detection power

Current pass rate. Enter it; this page does not measure it.

Check this value.

The smallest regression you would stop a ship for, in percentage points.

Check this value.

Two-sided alpha. 0.05 is the conventional choice.

Check this value.

The probability you want of seeing a real drop of that size. 0.8 means you catch it 80% of the time.

Check this value.

Fixed: the candidate is compared against a recorded baseline. Two-arm: both arms rerun fresh.

Check this value.

Put a confidence interval on it with the pass-rate CI calculator.

Wall-clock minutes, per-PR check

2.6

PR tier, concurrency-bound: per-run minutes under the binding constraint, plus fixed CI overhead.

Per-run minutes under the binding constraint, plus fixed CI overhead. A lower bound: no queueing, no tail latency, no scheduler wait.

TierCasesItemsMinutesBottleneck
PR 40 40 2.6 concurrency
Nightly 400 400 7.8 concurrency
Release gate 400 1,200 19.5 concurrency

Per-run spend, PR tier

$0.80

Developer wait (min/month)

310.0

The monthly total is the sum across three tiers, each multiplied by its own cadence.

TierRuns/monthMinutes/monthSpend/month
PR 120 310.0 $96.00
Nightly 30 235.0 $240.00
Release gate 4 78.0 $96.00
All tiers 154 623.0 $432.00

The power figure uses distinct cases, not graded items. Repeats reduce run-to-run variance; the repeated-run variance planner covers that.

TierCasesDetectable drop (pp)Power at your drop
PR 40 15.1 22%
Nightly 400 4.4 88%
Release gate 400 4.4 88%

Cases for target power

316 cases

The PR subset size that would reach the target power at the drop entered, and the minutes that subset would add: 4.0 on top of the 2.6 the PR check runs today, for 6.6 in total.

These figures are a worked illustration at round defaults. Replace every cell with your own numbers.

Export

minutes = overhead + max(items · latency / concurrency, calls · 60 / rate limit, one item) / 60How?

How this is calculated

The wall-clock estimate is a lower bound. It divides the total latency-seconds of work by the concurrency, compares that to the rate-limit ceiling, and takes whichever is larger. When both are smaller than the time for a single item, that single item is the floor. The number includes no queueing variance, no tail latency, no retries and no scheduler wait for a runner. A real run will be at least this long and usually longer.

Each item carries a system call and zero or more judge calls. The total latency for a tier is the item count times the sum of the system latency and the judge latency per call. Dividing by concurrency gives one bound; dividing the total API calls into the rate-limit window gives another. The bottleneck label beside the minutes figure names which bound won.

The money block multiplies items by the cost per item, adds runner-time cost when a runner rate is entered, and then multiplies each tier's per-run spend by its monthly cadence. The per-item cost is one number carried from the eval budget calculator, which breaks it down by tokens, model and judge. This page does not re-derive that arithmetic.

The power block counts distinct cases, not graded items. Repeats of one case are correlated, and the power math assumes independent observations. Wiring cases times trials into the sample size would inflate every power figure on the page. What repeats buy instead is variance reduction, which the repeated-run variance planner owns.

For each tier, the calculator inverts the standard one-proportion sizing formula to report the power that the tier's case count achieves at the entered drop and significance level. The inversion is exact: it solves the published sizing equation for the z-score on the power side and converts that to a probability through the normal CDF. The fixed-baseline design compares one arm against a recorded rate; the two-arm design compares two fresh runs, which needs a pooled variance and a larger sample for the same power.

The detectable drop is the complement: the largest effect each tier can catch at the target power. When the PR tier runs fewer cases than the suite, the page reports how much power the subset gave up and the probability that a real drop of the entered size passes the PR check unseen. The "cases for target power" line inverts the same formula the other way, telling the reader how large a PR subset would need to be to reach the power target, and how many minutes that subset would add.

Every rate on this page is typed by the reader, so no confidence interval applies. A confidence interval on the baseline belongs on the pass-rate CI calculator.

Formula: minutes = overhead + max(items · latency / concurrency, calls · 60 / rate limit, one item) / 60

Questions

Why is this different from the eval budget calculator?

The eval budget calculator prices one eval run from token counts and model rates. This page prices a cadence: three tiers of runs across a month, with wall-clock minutes under your concurrency and the detection power the per-PR tier gives up by running a subset. If you need the per-item cost this page asks for, start there.

Why does the power block ignore my trials?

Repeats of the same case are correlated. The power math assumes independent observations, so it counts distinct cases only. Trials help with variance across repeated runs of the same item; the repeated-run variance planner is the page for that question.

The PR tier shows less than 50% power. Should I run more cases?

Not necessarily. A per-PR tier at low power is still useful as a breakage check: it catches a prompt template that broke, a parser that stopped working, or an output that is no longer valid. Catching a 3-point quality regression takes a much larger set, and that is what the nightly and release tiers are for. The companion CI guide walks through which checks belong at which tier.

What does the bottleneck label mean?

It names the constraint that set the wall-clock floor. Concurrency means more parallel workers would help. Rate limit means more workers would not, because the provider cap already binds. Single-item means the tier has so few items that concurrency is already more than the work; only per-call latency can shorten it.

How accurate is the minutes estimate?

It is a lower bound. Real runs add queueing delays, tail latency, retries, warm-up time and scheduler waits that this page does not model. Plan for the number to be optimistic. The change-impact worksheet can narrow which suites a specific change needs to rerun, reducing the subset to fit the PR budget.

Sources

  1. NIST/SEMATECH e-Handbook of Statistical Methods, 7.2.4.2 'Sample sizes required'NIST/SEMATECH e-Handbook of Statistical Methods Retrieved